Fogger Machine

Demo Number 084
Location Shelf 11
Description Use this Fogger machine to demonstrate Phase Changes
 Related Demos 113
Tips
  • Procedure:
    • Dispense liquid into fog machine.
    • Allow the fog machine a few minutes to warm up.
    • Press button for fog operation.
  • DO NOT make too much fog, the fire alarm will be set off. Try to make as good ventilation as possible. Use a fan.

Want to check out this demo?

Visit the reservation page!

This Demo is Part of the following Categories: 4C30 Phase Changes: Liquid-Gas, 4B70 Adiabatic Pressure